Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1832348.015
Citation: 01002A
Citation Type: Serious
Abatement Status:
Initial Penalty: $16,550.00
Current Penalty: $9,930.00
Issuance Date: 07/17/2025
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 11/14/2025
Gravity: 10
Report ID: 0523900
Contest Date:
Final Order: 08/15/2025
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/15/2025 | $9,930.00 | 11/14/2025 | Serious | |
Penalty | Z: Issued | 07/17/2025 | $16,550.00 | 07/31/2025 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard were being followed: (a) Cheese department; On or about June 11, 2025, and dates prior, the employer did not conduct periodic inspections of the DMC lockout procedure at least annually to ensure the procedure was accurate, employees were knowledgeable on the procedure, and the requirements of this standard were being followed.