Violation Detail
Standard Cited: 19260850 C Preparatory operations.
Inspection Nr: 1813927.015
Citation: 01002A
Citation Type: Serious
Abatement Status:
Initial Penalty: $4,965.00
Current Penalty: $4,965.00
Issuance Date: 05/23/2025
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 05/30/2025
Gravity: 10
Report ID: 0213100
Contest Date: 06/12/2025
Final Order:
Related Event Code (REC): C
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | C: Contested | 06/17/2025 | $4,965.00 | 05/30/2025 | Serious | |
| Penalty | Z: Issued | 05/23/2025 | $4,965.00 | 05/30/2025 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1926.850(c): All electric, gas, water, steam, sewer, and other service lines were not shut off, capped, or otherwise controlled, outside the building line before demolition work was started, and the affected utility companies were not notified: a) Worksite - On or about March 26, 2025, an employee working from an aerial lift (JLG - 1350SJP, Number on aerial lift: 416505) that was not insulated was exposed to electrocution hazards due to cutting the metal beam (leg) of the water tower within 10 feet of electric power lines (13.2kV) that were not turned off before the demolition work of taking down a water tower started, and the affected utility company was not notified.