Violation Detail
Standard Cited: 19100147 C02 III The control of hazardous energy (lockout/tagout).
Inspection Nr: 1812503.015
Citation: 01002A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,620.00
Current Penalty: $4,634.00
Issuance Date: 08/01/2025
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 08/29/2025
Gravity: 5
Report ID: 0523900
Contest Date:
Final Order: 09/10/2025
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/10/2025 | $4,634.00 | 08/29/2025 | Serious | |
Penalty | Z: Issued | 08/01/2025 | $6,620.00 | 08/29/2025 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.147(c)(2)(iii): New machines and equipment that were installed after January 2, 1990, were not provided with energy isolating devices designed to accept lockout devices: (a) Pallet making area; On or about March 18, 2025, and dates prior, the pneumatic isolation valve installed on a Woodpecker brand pallet nailing machine during the initial setup at this facility between September and November of 2024 was not designed to and/or capable of accepting lockout devices to secure the valve in the off position. The machine was equipped with pneumatically powered nail guns (raise/lower and nailing), pallet flippers, and pallet stacker cylinders.