Violation Detail
Standard Cited: 19100333 B02 IV A Selection and use of work practices
Inspection Nr: 1792166.015
Citation: 01002A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $16,550.00
Current Penalty: $16,550.00
Issuance Date: 05/16/2025
Nr Instances: 1
Nr Exposed: 21
Abatement Date: 06/20/2025
Gravity: 10
Report ID: 0523400
Contest Date:
Final Order: 06/11/2025
Related Event Code (REC): A
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/11/2025 | $16,550.00 | 06/20/2025 | Serious | |
Penalty | Z: Issued | 05/16/2025 | $16,550.00 | 06/20/2025 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
1910.333(b)(2)(iv)(A) Before circuits or equipment were worked as deenergized, a qualified person did not operate the equipment operating controls or otherwise verify that the equipment could not be restarted:(a) (LOCATION) (IDENTIFY SPECIFIC OPERATIONS AND/OR CONDITIONS) 1910.333(b)(2)(iv)(A): A qualified person shall operate the equipment operating controls or otherwise verify that the equipment cannot be restarted. (a) On or about December 7, 2024, and days prior at the generator/ transformer and the lines used to transmit electrical energy from the generator to equipment in the "Sound Room" test area, the employer did not verify the main aisle switch was deenergized and in the open position to render the circuit inoperable. This exposed employees to electrical hazards.