Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 1786375.015
Citation: 01002A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $8,276.00
Current Penalty: $5,794.00
Issuance Date: 02/05/2025
Nr Instances: 2
Nr Exposed: 50
Abatement Date: 03/04/2025
Gravity: 5
Report ID: 0521700
Contest Date:
Final Order: 03/05/2025
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/05/2025 | $5,794.00 | 03/04/2025 | Serious | |
Penalty | Z: Issued | 02/05/2025 | $8,276.00 | 03/04/2025 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.36(d)(1): Employee(s) were not able to open an exit route door from the inside at all times without keys, tools, or special knowledge. a. On or about November 6, 2024, in the chemical room, the fire exit door did not provide free egress/escape from the building in that the door was locked from the inside by a sliding pin, thereby exposing employees to the hazards associated with smoke, fires and other emergencies. b. On or about November 6, 2024, in the baler room, the fire exit door did not provide free egress/escape from the building in that the door was locked from the inside by a sliding pin, thereby exposing employees to the hazards associated with smoke, fires and other emergencies.