Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1786098.015
Citation: 01002A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $14,187.00
Current Penalty: $14,187.00
Issuance Date: 02/14/2025
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 03/13/2025
Gravity: 5
Report ID: 0215800
Contest Date: 03/07/2025
Final Order:
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 03/07/2025 | $14,187.00 | 03/13/2025 | Serious | |
Penalty | Z: Issued | 02/14/2025 | $14,187.00 | 03/13/2025 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: a) Line 2, National Pipe and Plastics Inc., 15 Mills Avenue, Endicott, NY 13760, on or about 11/3/2024; Lockout/tagout energy control procedures were not utilized by employees who performed servicing and maintenance tasks including, but not limited to, repairing/replacing the travel screw on the Line 2 Vacuum Tank. Abatement certification must be submitted.