Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1780926.015
Citation: 01002A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $8,276.00
Current Penalty: $5,793.20
Issuance Date: 02/28/2025
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 06/13/2025
Gravity: 5
Report ID: 0418600
Contest Date:
Final Order: 05/05/2025
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/05/2025 | $5,793.20 | 06/13/2025 | Serious | |
| Penalty | Z: Issued | 02/28/2025 | $8,276.00 | 03/14/2025 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.147(c)(4)(i):Procedures were not developed, documented, or utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: a) At 2733 Gunter Park Dr. West: On or about October 9, 2024, and at times prior employees were exposed to crush-by hazards when performing maintenance activities on the Dave press without energy control procedures being developed, documented, or utilized.