Violation Detail
Standard Cited: 19100333 C03 Selection and use of work practices
Inspection Nr: 1775426.015
Citation: 01002A
Citation Type: Serious
Abatement Status: Not Completed - Worksite Changed
Initial Penalty: $4,965.00
Current Penalty: $4,965.00
Issuance Date: 02/13/2025
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 03/12/2025
Gravity: 10
Report ID: 0729700
Contest Date:
Final Order: 04/10/2025
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 02/13/2025 | $4,965.00 | 03/12/2025 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.333(c)(3): When work was to be performed near overhead lines, the lines were not de-energized and grounded, nor were other protective measures provided before work was started. Where lines are to be de-energized, arrangements were not made with the person or organization that operates or controls the electric circuits involved to de-energize and ground them. On or about September 13, 2024, employees were exposed to electrical hazards when trimming a tree near energized unguarded overhead power lines. The employer did not arrange with the power distributor for the overhead power lines to be de-energized and grounded, nor did the employer institute other protective measures before tree trimming work started. An employee trimmed with a manual aluminum pole saw 9 feet, 9 inches from an energized unguarded 7200 volts overhead power distribution line.