Violation Detail
Standard Cited: 19100147 C06 I B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1748502.015
Citation: 01002A
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $13,066.00
Current Penalty: $3,500.00
Issuance Date: 09/06/2024
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 10/02/2024
Gravity: 10
Report ID: 0522000
Contest Date:
Final Order: 09/25/2024
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/25/2024 | $3,500.00 | 10/02/2024 | Other | |
Penalty | Z: Issued | 09/06/2024 | $13,066.00 | 10/02/2024 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.147(c)(6)(i): The employer shall conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed. (c)(6)(i)(B): The periodic inspection shall be conducted to correct any deviations or inadequacies identified. a) On or about 05/08/2024, employer did not conduct an adequate periodic inspection of the machine specific procedures for the R2 01.20 feed compressor located in the the R2 compressor room that identified that valves (discharge, suction, and recycle) were not being padlocked and chained during lockout. The safety work permit/checklist allowed for authorized employees performing the task to audit themselves during the task.