Violation Detail
Standard Cited: 19100305 G02 III Wiring methods, components, and equipment for general use.
Inspection Nr: 1747395.015
Citation: 01002A
Citation Type: Other
Abatement Date: 12/03/2024 2
Initial Penalty: $16,131.00
Current Penalty: $8,065.50
Issuance Date: 11/05/2024
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): A
Gravity: 10
Report ID: 0626000
Contest Date: 11/22/2024
Final Order: 02/25/2025
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 02/25/2025 | $8,065.50 | 12/03/2024 | Other | |
Penalty | C: Contested | 12/16/2024 | $16,131.00 | 12/03/2024 | Serious | |
Penalty | Z: Issued | 11/05/2024 | $16,131.00 | 12/03/2024 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.305(g)(2)(iii): Flexible cords and cables were not connected to devices and fittings so that strain relief was provided that would prevent pull from being directly transmitted to joints or terminal screws. On or about 5/8/2024, and times prior thereto, at wind turbine # 43-B employees conducted scheduled maintenance and used the hoist winch powered by 220 volts via a flexible cord and plug-electrical connector without a strain relief.