Violation Detail
Standard Cited: 19260251 A01 Rigging equipment for material handling.
This violation item has been deleted.
Inspection Nr: 1746948.015
Citation: 01002A
Citation Type: Serious
Abatement Status:
Initial Penalty: $9,680.00
Current Penalty: $0.00
Issuance Date: 10/21/2024
Nr Instances: 2
Nr Exposed: 5
Abatement Date: 11/15/2024
Gravity: 5
Report ID: 0625500
Contest Date:
Final Order: 11/07/2024
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/07/2024 | $0.00 | 11/15/2024 | Serious | |
Penalty | Z: Issued | 10/21/2024 | $9,680.00 | 11/15/2024 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1926.251(a)(1): Rigging equipment for material handling was not inspected prior to use on each shift and as necessary during its use to ensure that it was safe: On or about May 9, 2024, employees used nylon slings that had excessive wear, were frayed, and showed signs of discoloration while lifting pipes into a vertical wall trench without inspecting them prior to use.