Violation Detail
Standard Cited: 19260651 B04 Specific Excavation Requirements.
Inspection Nr: 1744017.015
Citation: 01002A
Citation Type: Other
Abatement Status: Corrected During Inspection
Initial Penalty: $16,131.00
Current Penalty: $16,131.00
Issuance Date: 07/29/2024
Nr Instances: 1
Nr Exposed: 2
Abatement Date:
Gravity: 10
Report ID: 0522000
Contest Date:
Final Order: 08/28/2024
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/28/2024 | $16,131.00 | Other | ||
Penalty | Z: Issued | 07/29/2024 | $16,131.00 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1926.651(b)(4): While the excavation is open, underground installations shall be protected, supported or removed as necessary to safeguard employees. a) On or about April 25, 2024, the employer failed to ensure that exposed utilities, such as the existing gas line, were protected or supported, exposing employees to natural gas leaks while performing work in the trench.