Violation Detail
Standard Cited: 19100269 D02 IV D Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1705593.015
Citation: 01002A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $16,131.00
Current Penalty: $12,098.25
Issuance Date: 03/12/2024
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 05/06/2024
Gravity: 10
Report ID: 0419700
Contest Date:
Final Order: 04/07/2024
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/07/2024 | $12,098.25 | 05/06/2024 | Serious | |
Penalty | Z: Issued | 03/12/2024 | $16,131.00 | 04/05/2024 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.269(d)(2)(iv)(D): The procedure did not clearly and specifically outline specific requirements for testing a machine or equipment to determine and verify the effectiveness of lockout devices, tagout devices, and other energy control measures. a. At Florida Power and Light's Sunshine Solar power Farm, located at 8690 Hogan Road in Live Oak Florida: The employer exposed employees to electrical shock and burn hazards, in that the established procedures for remotely shutting down and testing an inverter was not clear or specific.