Violation Detail
Standard Cited: 19100333 C03 Selection and use of work practices
Inspection Nr: 1691855.015
Citation: 01002A
Citation Type: Serious
Abatement Date: 01/05/2024 5
Initial Penalty: $4,688.00
Current Penalty: $3,516.00
Issuance Date: 12/08/2023
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity: 10
Report ID: 0626300
Contest Date:
Final Order: 01/04/2024
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/04/2024 | $3,516.00 | 01/05/2024 | Serious | |
Penalty | Z: Issued | 12/08/2023 | $4,688.00 | 01/05/2024 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.333(c)(3): When work was to be performed near overhead lines, the lines were not de-energized and grounded, nor were other protective measures provided before work was started. Where lines are to be de-energized, arrangements were not made with the person or organization that operates or controls the electric circuits involved to de-energize and ground them. a) On or about August 17, 2023, and times prior thereto, employees were exposed to electrical hazards while working near overhead power lines with 7,200 volts that were not de-energized and grounded prior to the work beginning.