Violation Detail
Standard Cited: 19100146 D Permit-required confined spaces
Inspection Nr: 1670319.015
Citation: 01002A
Citation Type: Other
Abatement Date: 11/08/2023 2
Initial Penalty: $12,278.00
Current Penalty: $9,822.40
Issuance Date: 09/26/2023
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity: 5
Report ID: 0523900
Contest Date:
Final Order: 10/11/2023
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/11/2023 | $9,822.40 | 11/08/2023 | Other | |
Penalty | Z: Issued | 09/26/2023 | $12,278.00 | 11/08/2023 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.146(d): Under the permit space program required by paragraph (c)(4) of this section, the employer did not ensure that the requirements of (d)(1) through (d)(14) were met: (a) Building F2, pallet rack blasting and paint line area; On or about May 11, 2023, entry was made into the Viking brand media blaster to close internal doors/baffles when switching the paint line over to metal frames. The employer's permit space program was not implemented with respect to this space prior to and during entry.