Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
This violation item has been deleted.
Inspection Nr: 1667662.015
Citation: 01002A
Citation Type: Serious
Abatement Status:
Initial Penalty: $9,844.00
Current Penalty: $0.00
Issuance Date: 08/30/2023
Nr Instances: 68
Nr Exposed: 14
Abatement Date: 09/14/2023
Gravity: 10
Report ID: 0523300
Contest Date: 09/25/2023
Final Order: 04/22/2024
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 04/22/2024 | $0.00 | 09/14/2023 | Serious | |
Penalty | C: Contested | 09/26/2023 | $9,844.00 | 09/14/2023 | Serious | |
Penalty | Z: Issued | 08/30/2023 | $9,844.00 | 09/14/2023 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: a) On or about August 18, 2023, hazardous energy control procedures for all MR-12 Case Packer #1 line a were not utilized when engaging in covered activities such as sanitation. b) On or about August 18, 2023, hazardous energy control procedures for all MR-12 Case Packer #1 line b were not utilized when engaging in covered activities such as sanitation. c) On or about August 18, 2023, hazardous energy control procedures for all MR-12 Case Packer #2 line a were not utilized when engaging in covered activities such as sanitation. d) On or about August 18, 2023, hazardous energy control procedures for all MR-12 Case Packer #2 line b were not utilized when engaging in covered activities such as sanitation. e) On or about August 18, 2023, hazardous energy control procedures for all MR-12 Case Packer #3 line a were not utilized when engaging in covered activities such as sanitation. f) On or about August 18, 2023, hazardous energy control procedures for all MR-12 Case Packer #3 line b were not utilized when engaging in covered activities such as sanitation. g) On or about August 18, 2023, hazardous energy control procedures for all MR-12 Case Packer #4 line a were not utilized when engaging in covered activities such as sanitation. h) On or about August 18, 2023, hazardous energy control procedures for all MR-12 Case Packer #4 line b were not utilized when engaging in covered activities such as sanitation. i) On or about August 18, 2023, hazardous energy control procedures for all MR-12 Case Packer #5 line a were not utilized when engaging in covered activities such as sanitation. j) On or about August 18, 2023, hazardous energy control procedures for all MR-12 Case Packer #5 line b were not utilized when engaging in covered activities such as sanitation. k) On or about August 17, 2023, and times prior, hazardous energy control procedures for the Denesters line 1 were not utilized when engaging in covered activities such as sanitation. l) On or about August 17, 2023, and times prior, hazardous energy control procedures for the Denesters line 2 were not utilized when engaging in covered activities such as sanitation. m) On or about August 17, 2023, and times, prior, hazardous energy control procedures for the Denesters line 3 were not utilized when engaging in covered activities such as sanitation. n) On or about August 17, 2023, and times prior, hazardous energy control procedures for the Denesters line 4 were not utilized when engaging in covered activities such as sanitation. o) On or about August 17, 2023, and times prior, hazardous energy control procedures for the Denesters line 5 were not utilized when engaging in covered activities such as sanitation. p) On or about August 17, 2023, and times prior, hazardous energy control procedures for the Denesters line 6 were not utilized when engaging in covered activities such as sanitation. q) On or about August 17, 2023, and times prior, hazardous energy control procedures for the Denesters line 7 were not utilized when engaging in covered activities such as sanitation. r) On or about August 17, 2023, hazardous energy control procedures for the Denesters line 8 were not utilized when engaging in covered activities such as sanitation. s) On or about August 17, 2023, and times prior, hazardous energy control procedures for the Denesters line 9 were not utilized when engaging in covered activities such as sanitation. t) On or about August 17, 2023, and times prior, hazardous energy control procedures for the Denesters line 10 were not utilized when engaging in covered activities such as sanitation. u) On or about August 17, 2023, and times prior, hazardous energy control procedures for the Denesters line 11 were not utilized when engaging in covered activities such as sanitation. v) On or about August 17, 2023, and times prior, hazardous energy control procedures for the Denesters line 12 were not utilized when engaging in covered activities such as sanitation. w) On or about August 17, 2023, and times prior, hazardous energy control procedures for the Denesters line 13 were not utilized when engaging in covered activities such as sanitation. x) On or about August 17, 2023, and times prior, hazardous energy control procedures for the Denesters line 14 were not utilized when engaging in covered activities such as sanitation. y) On or about August 17, 2023, hazardous energy control procedures for the Denesters line 15 were not utilized when engaging in covered activities such as sanitation. z) On or about August 17, 2023, and times prior hazardous energy control procedures for the Denesters line 16 were not utilized when engaging in covered activities such as sanitation. aa) On or about August 17, 2023, and times prior, hazardous energy control procedures for the Denesters line 17 were not utilized when engaging in covered activities such as sanitation. ab) On or about August 17, 2023, and times prior hazardous energy control procedures for the Denesters line 18 were not utilized when engaging in covered activities such as sanitation. ac) On or about August 17, 2023, and times prior, hazardous energy control procedures for the Denesters line 19 were not utilized when engaging in covered activities such as sanitation. ad) On or about August 17, 2023, and times prior, hazardous energy control procedures for the Denesters line 20 were not utilized when engaging in covered activities such as sanitation. ae) On or about August 17, 2023, and times prior, hazardous energy control procedures for the Denesters line 21 were not utilized when engaging in covered activities such as sanitation. af) On or about August 17, 2023, and times prior, hazardous energy control procedures for the Denesters line 22 were not utilized when engaging in covered activities such as sanitation. ag) On or about August 17, 2023, and times prior, hazardous energy control procedures for the Denesters line 23 were not utilized when engaging in covered activities such as sanitation. ah) On or about August 17, 2023, and times prior, hazardous energy control procedures for the Denesters line 24 were not utilized when engaging in covered activities such as sanitation. ai) On or about August 17, 2023, and times prior, hazardous energy control procedures for the Denesters line 25 were not utilized when engaging in covered activities such as sanitation. aj) On or about August 17, 2023, and times prior, hazardous energy control procedures for the Denesters line 26 were not utilized when engaging in covered activities such as sanitation. ak) On or about August 17, 2023, and times prior, hazardous energy control procedures for the Denesters line 27 were not utilized when engaging in covered activities such as sanitation. al) On or about August 17, 2023, and times prior, hazardous energy control procedures for the Denesters line 28 were not utilized when engaging in covered activities such as sanitation. am) On or about August 17, 2023, hazardous energy control procedures for the Omnia PX700 line 1 (left) were not utilized when engaging in covered activities such as sanitation. an) On or about August 17, 2023, hazardous energy control procedures for the Omnia PX700 line 2 (right) were not utilized when engaging in covered activities such as sanitation. ao) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 1 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. ap) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 2 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. aq) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 3 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. ar) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 4 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. as) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 5 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. at) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 6 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. au) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 7 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. av) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 8 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. aw) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 9 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. ax) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 10 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. ay) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 11 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. az) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 12 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. ba) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 13 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. bb) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 14 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. bc) On or about August 17, 2023, hazardous energy control procedures for packing lane infeed line 15 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. bd) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 16 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. be) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 17 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. bf) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 18 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. bg) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 19 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. bh) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 20 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. bi) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 21 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. bj) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 22 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. bk) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 23 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. bl) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 24 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. bm) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 25 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. bn) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 26 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. bo) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 27 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. bp) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 28 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation.