Violation Detail
Standard Cited: 19261101 G01 II Asbestos
Inspection Nr: 1661090.015
Citation: 01002A
Citation Type: Other
Abatement Status: Corrected During Inspection
Initial Penalty: $7,813.00
Current Penalty: $0.00
Issuance Date: 08/31/2023
Nr Instances: 1
Nr Exposed: 1
Abatement Date:
Gravity: 5
Report ID: 0214700
Contest Date: 09/08/2023
Final Order: 06/05/2024
Related Event Code (REC): C
Emphasis:
Substance: 9020
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | R: Review Commission | 06/05/2024 | $0.00 | Other | ||
| Penalty | C: Contested | 09/08/2023 | $7,813.00 | Serious | ||
| Penalty | Z: Issued | 08/31/2023 | $7,813.00 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1926.1101(g)(1)(ii):The employer did not use engineering controls and work practices in all operations covered by 29 CFR 1926.1101, regardless of the levels of exposure, in the form of wet methods or wetting agents to control employee exposures during asbestos handling, mixing, removal, cutting, application and cleanup: (A) In the Harbor House attic, Engineering controls and work practices were not implemented when insulation was disturbed during the upgrade of the heating ventilation and air conditioning system. On or about March 8, 2023. Note: Because abatement of this violation is already documented in the case file, the employer need not submit certification or documentation of abatement for this violation as normally required by CFR 1903.19.