Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 1644859.015
Citation: 01002A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $3,572.00
Current Penalty: $1,200.00
Issuance Date: 02/21/2023
Nr Instances: 2
Nr Exposed: 1
Abatement Date: 03/10/2023
Gravity: 5
Report ID: 0134000
Contest Date:
Final Order: 03/20/2023
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/20/2023 | $1,200.00 | 03/10/2023 | Serious | |
| Penalty | Z: Issued | 02/21/2023 | $3,572.00 | 03/10/2023 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.36(d)(1):Employee(s) were not able to open an exit route door from the inside at all times without keys, tools, or special knowledge: Location - 9 Myrtle Street, Waltham, MA 02453 (a) On or about 1/20/23, an exit route door leading from the warehouse office space to the exterior/front of the building, was secured to the outside. The door was not able to be opened without actively disengaging the locking mechanisms in use. (b) On or about 1/20/23, an exit route door leading from the warehouse storage area to the exterior/front of the building, was secured to the outside. The door was not able to be opened without actively disengaging the locking mechanisms in use.
Translate