Violation Detail
Standard Cited: 19100107 B05 I Spray finishing using flammable and combustible materials.
Inspection Nr: 1635082.015
Citation: 01002A
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $4,687.00
Current Penalty: $0.00
Issuance Date: 05/03/2023
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 05/30/2023
Gravity: 1
Report ID: 0522300
Contest Date:
Final Order: 05/24/2023
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/24/2023 | $0.00 | 05/30/2023 | Other | |
Penalty | Z: Issued | 05/03/2023 | $4,687.00 | 05/30/2023 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.107(b)(5)(i): Visible gauges or audible alarm or pressure activated devices were not installed to indicate or insure that the required air velocity is maintained: a) On or about November 29, 2022, the employer did not have a manometer in the tire cage spray paint booth that would ensure the air velocity was being maintained. b) On or about November 29, 2022, the employer did not have a manometer in the electrostatic spray paint booth that would ensure the air velocity was being maintained. b) On or about April 20, 2023, the employer did not ensure the installed manometer in the tire cage spray paint booth maintained an air velocity of 100 fpm. Air velocity measurements were taken at the face of the booth and averaged 95.5 fpm.