Violation Detail
Standard Cited: 19100036 B01 Design and construction requirements for exit routes.
This violation item has been deleted.
Inspection Nr: 1618555.015
Citation: 01002A
Citation Type: Serious
Abatement Status:
Initial Penalty: $14,733.00
Current Penalty: $0.00
Issuance Date: 02/24/2023
Nr Instances: 2
Nr Exposed: 56
Abatement Date: 03/08/2023
Gravity: 5
Report ID: 0317700
Contest Date: 03/20/2023
Final Order: 09/01/2023
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 09/01/2023 | $0.00 | 03/08/2023 | Serious | |
Penalty | C: Contested | 03/22/2023 | $14,733.00 | 03/08/2023 | Serious | |
Penalty | Z: Issued | 02/24/2023 | $14,733.00 | 03/08/2023 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.36(b)(1): Two exit routes. At least two exit routes were not available in the workplace to permit prompt evacuation of employees and other building occupants during an emergency, except as allowed in paragraph (b)(3) of this section: a) Main Stock Room, Loading Dock: Employees were exposed to fire hazards from delayed egress due to only one exit route being present when a secondary exit door was unavailable because it was padlocked, on or about August 30, 2022. b) Hazardous Waste Room, Loading Dock: Employees were exposed to fire hazards from delayed egress due to only one exit route being present when a secondary exit door was unavailable because it was padlocked, on or about August 30, 2022. Abatement certification required.