Violation Detail
Standard Cited: 19261153 C01
Inspection Nr: 1613379.015
Citation: 01002A
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $7,813.00
Current Penalty: $4,687.80
Issuance Date: 02/01/2023
Nr Instances: 1
Nr Exposed: 4
Abatement Date:
Gravity: 5
Report ID: 0626700
Contest Date:
Final Order: 02/21/2023
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/21/2023 | $4,687.80 | Serious | ||
Penalty | Z: Issued | 02/01/2023 | $7,813.00 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1926.1153(c)(1): For each employee engaged in a task identified on Table 1, the employer did not fully and properly implement the engineering controls, work practices, and respiratory protection specified for the task on Table 1: a) On or about August 9, 2022, at the jobsite, where a Makita power cutter saw was used to cut precast concrete pipe without using an integrated water delivery system or dust collection system.