Violation Detail
Standard Cited: 19100036 G04 Design and construction requirements for exit routes.
Inspection Nr: 1522994.015
Citation: 01002A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,461.00
Current Penalty: $3,500.00
Issuance Date: 08/13/2021
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 09/17/2021
Gravity: 5
Report ID: 0830500
Contest Date:
Final Order: 09/01/2021
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/01/2021 | $3,500.00 | 09/17/2021 | Serious | |
Penalty | Z: Issued | 08/13/2021 | $5,461.00 | 09/17/2021 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.36(g)(4):Objects that projected into the exit route reduced the width of the exit route to less than the minimum width requirements for exit routes. (a) Nature Soy, LLC located at 6123 Arapahoe Road Boulder, CO 80303. On 3/31/2021 and at times prior, the employer failed to remove four vehicle tires, three cardboard boxes and one plastic tote which reduced the width of the exit route to less than 28 inches in the storage building. In the event of a fire requiring egress from the facility, employees are exposed to tripping, smoke inhalation and burn hazards.