Violation Detail
Standard Cited: 19100028 B03 I Duty to have fall protection and falling object protection.
Inspection Nr: 1518156.015
Citation: 01002A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $13,653.00
Current Penalty: $8,000.00
Issuance Date: 08/20/2021
Nr Instances: 1
Nr Exposed: 12
Abatement Date: 09/30/2021
Gravity: 10
Report ID: 0316700
Contest Date:
Final Order: 09/09/2021
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 09/09/2021 | $8,000.00 | 09/30/2021 | Serious | |
| Penalty | Z: Issued | 08/20/2021 | $13,653.00 | 09/16/2021 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.28(b)(3)(i):29 CFR 1910.28(b)(3)(i): The employer did not ensure that each employee is protected from falling through any hole (including skylights) that is 4 feet (1.2 m) or more above a lower level by one or more of the methods listed in 29 CFR 1910.28(b)(3)(i)(A)-(D): (a) BUILDING 41B, SMELTING DEPARTMENT - Employees attending the smelter kettles were exposed to fall hazards into the 6.25 foot deep smelter kettles when they performed tasks that included but were not limited to returning lead to the kettle through the access hole in the kettle hood, on or about March 6, 2021. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Translate