Violation Detail
Standard Cited: 19100178 M08 Powered industrial trucks.
This violation item has been deleted.
Inspection Nr: 1514184.015
Citation: 01002A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $10,533.00
Current Penalty: $0.00
Issuance Date: 05/11/2021
Nr Instances: 1
Nr Exposed: 90
Abatement Date: 05/20/2021
Gravity: 5
Report ID: 0524700
Contest Date:
Final Order: 06/07/2021
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 06/07/2021 | $0.00 | 05/20/2021 | Serious | |
| Penalty | Z: Issued | 05/11/2021 | $10,533.00 | 05/20/2021 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.178(m)(8): Sufficient headroom was not provided under overhead installations, lights, pipes, sprinkler system, etc: Pilkington North America, Inc. - Rossford, Ohio: On or about January 7, 2021, the employer did not ensure sufficient headroom was provided under the encapsulation electrical transformer installation for loads carried by forklifts. Employees were exposed to struck-by hazards from forklift loads that hit the installation and fall from the forklift. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence, or written records.
Translate