Violation Detail
Standard Cited: 19260451 G04 I General requirements.
Inspection Nr: 1509322.015
Citation: 01002A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,557.00
Current Penalty: $6,689.90
Issuance Date: 03/19/2021
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 04/08/2021
Gravity: 10
Report ID: 0522500
Contest Date:
Final Order: 04/15/2021
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/15/2021 | $6,689.90 | 04/08/2021 | Serious | |
Penalty | Z: Issued | 03/19/2021 | $9,557.00 | 04/08/2021 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1926.451(g)(4)(i): Guardrail systems shall be installed along all open sides and ends of platforms. Guardrail systems shall be installed before the scaffold is released for use by employees other than erection/dismantling crews. a. On or about October 28, 2020, the employer did not install guardrails to all open sides of the working platform. The guardrail system was not installed when two employees worked off the top of the Bil-Jax Rolling-Tower Scaffold.