Violation Detail
Standard Cited: 19100147 C04 II B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1502816.015
Citation: 01002A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $10,728.00
Current Penalty: $7,510.00
Issuance Date: 04/16/2021
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 05/17/2021
Gravity: 5
Report ID: 0524500
Contest Date:
Final Order: 05/10/2021
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/10/2021 | $7,510.00 | 05/17/2021 | Serious | |
Penalty | Z: Issued | 04/16/2021 | $10,728.00 | 05/17/2021 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.147(c)(4)(ii)[B]: The energy control procedures did not clearly and specifically outline the steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy. On or about November 14, 2020, Employees were exposed to unexpected start-up or release of stored energy while performing servicing and maintenance activities, including but not limited to the B-13 Molding Machine, because the employer did not clearly and specifically outline the steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy.