Violation Detail
Standard Cited: 19100269 L01 III Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1478473.015
Citation: 01002A
Citation Type: Other
Abatement Date: 08/30/2020 2
Initial Penalty: $7,711.00
Current Penalty: $12,000.00
Issuance Date: 07/14/2020
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity:
Report ID: 0636900
Contest Date:
Final Order: 07/30/2020
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/30/2020 | $12,000.00 | 08/30/2020 | Other | |
Penalty | Z: Issued | 07/14/2020 | $7,711.00 | 08/11/2020 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.269(l)(1)(iii): Electric lines and equipment were not considered and treated as energized before they had been deenergized in accordance with paragraph (d) or (m) of this section. At a work place located at 4092 County Road 140, Seymour, Texas; the employer did not ensured, employees working on or near energized switch gears, treat them as being energized, exposing them to arc flash hazards.