Violation Detail
Standard Cited: 19100219 C04 I Mechanical power-transmission apparatus.
Inspection Nr: 1465623.015
Citation: 01002A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $13,494.00
Current Penalty: $4,725.00
Issuance Date: 08/19/2020
Nr Instances: 1
Nr Exposed: 10
Abatement Date: 09/18/2020
Gravity: 10
Report ID: 0419400
Contest Date:
Final Order: 09/24/2020
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/24/2020 | $4,725.00 | 09/18/2020 | Serious | |
Penalty | Z: Issued | 08/19/2020 | $13,494.00 | 09/18/2020 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.219(c)(4)(i): Unguarded projecting shaft end(s) did not present a smooth edge and end and projected more than one half the diameter of the shaft. (a) Plant 2 S9 Slitter Conveyor - On or about February 26, 2020 the employer did not ensure that a rotating shaft at the of a transfer conveyor was guarded, exposing employees to a caught-in hazard.