Violation Detail
Standard Cited: 19100303 F02 General.
Inspection Nr: 1458691.015
Citation: 01002A
Citation Type: Serious
Abatement Date: 08/03/2020 2
Initial Penalty: $6,940.00
Current Penalty: $4,164.00
Issuance Date: 07/14/2020
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 5
Report ID: 0625400
Contest Date:
Final Order: 08/04/2020
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/04/2020 | $4,164.00 | 08/03/2020 | Serious | |
Penalty | Z: Issued | 07/14/2020 | $6,940.00 | 08/03/2020 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.303(f)(2): Each service, feeder, and branch circuit, at its disconnecting means or overcurrent device, was not legibly marked to indicate its purpose, nor located and arranged so the purpose was evident: On or about January 24, 2020, and times prior thereto, the breakers in the panel box located outside the building that would control the MCC breakers were not legibly marked to indicate the purpose. The breakers go to a MCC unit, which had the breaker for the Fulton furnace. Employees exposed to an electrical shock hazard and delay of isolating and de-energizing the electricity.