Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 1444683.015
Citation: 01002A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $13,494.00
Current Penalty: $0.00
Issuance Date: 02/10/2020
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 02/21/2020
Gravity: 10
Report ID: 0626000
Contest Date: 03/04/2020
Final Order: 04/10/2023
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 04/10/2023 | $0.00 | 02/21/2020 | Serious | |
Penalty | C: Contested | 03/06/2020 | $13,494.00 | 02/21/2020 | Serious | |
Penalty | Z: Issued | 02/10/2020 | $13,494.00 | 02/21/2020 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): At this establishment, employees worked from a scaffold which was not fully planked.