Violation Detail
Standard Cited: 19100036 A01 Design and construction requirements for exit routes.
Inspection Nr: 1438182.015
Citation: 01002A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $8,675.00
Current Penalty: $6,072.00
Issuance Date: 02/13/2020
Nr Instances: 1
Nr Exposed: 50
Abatement Date: 03/11/2020
Gravity: 5
Report ID: 0521700
Contest Date:
Final Order: 03/04/2020
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/04/2020 | $6,072.00 | 03/11/2020 | Serious | |
Penalty | Z: Issued | 02/13/2020 | $8,675.00 | 03/11/2020 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.36(a)(1): An exit route must be permanent. Each exit route must be a permanent part of the workplace. a. On or about October 16, 2019, in the facility, exit routes did not exist thereby exposing employees to fire and smoke hazards in the event of an emergency.