Violation Detail
Standard Cited: 19100147 C04 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 1417490.015
Citation: 01002A
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $9,282.00
Current Penalty: $0.00
Issuance Date: 12/09/2019
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 01/28/2020
Gravity:
Report ID: 0112600
Contest Date:
Final Order: 01/07/2020
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/07/2020 | $0.00 | 01/28/2020 | Other | |
Penalty | Z: Issued | 12/09/2019 | $9,282.00 | 01/28/2020 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.147(c)(4)(ii): Procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance including, but not limited to, 29 CFR 1910.147(c)(4)(ii)(A), (c)(4)(ii)(B), (c)(4)(ii)(C) and (c)(4)(ii)(D): (a) Site: On the production floor, at Van Dorn 350 Ton Press #1019, in the facility at 100 Simplex Drive, Westminster, MA 01453: On 7/23/2019 the Energy Control Procedure did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be used for the control of hazardous energy, and the means to enforce compliance - including the steps for removal of lockout devices or tagout devices - with the result that an employee improperly applied LOTO procedures while performing work on the machine.