Violation Detail
Standard Cited: 19100147 C06 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 1415647.015
Citation: 01002A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $8,525.00
Current Penalty: $5,967.50
Issuance Date: 07/31/2019
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 09/17/2019
Gravity: 5
Report ID: 0729300
Contest Date:
Final Order: 08/19/2019
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/19/2019 | $5,967.50 | 09/17/2019 | Serious | |
Penalty | Z: Issued | 07/31/2019 | $8,525.00 | 09/17/2019 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.147(c)(6)(ii): The employer did not certify that the periodic inspections have been performed. The certification did not identify the machine or equipment on which the energy control procedure was being utilized, the date of the inspection, the employees included in the inspection, and the person performing the inspection: At 1120 Mason Circle S., Pevely, Missouri, the employer did not document that periodic inspections of machinery such as the Normac #1 Grinding Machine, m/n BS-35, were being performed. This violation was noted on 07/23/19.