Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1413407.015
Citation: 01002A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $11,934.00
Current Penalty: $4,260.00
Issuance Date: 10/23/2019
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 11/26/2019
Gravity: 10
Report ID: 0522000
Contest Date:
Final Order: 11/12/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/12/2019 | $4,260.00 | 11/26/2019 | Serious | |
Penalty | Z: Issued | 10/23/2019 | $11,934.00 | 11/26/2019 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.147(c)(4)(i): Energy Control Procedure. Procedures shall be developed, documented and utilized for the control of potentially hazardous energy when employees are engaged in the activities covered by this section. a) On or about July 8, 2019 the employer had not developed, documented and utilized specific energy control procedures for operators engaged in servicing and maintenance activities, such as but not limited to changing out the molds on the Ferry Mold Machines.