Violation Detail
Standard Cited: 19100219 E03 I Mechanical power-transmission apparatus.
Inspection Nr: 1410373.015
Citation: 01002A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $13,260.00
Current Penalty: $6,630.00
Issuance Date: 11/26/2019
Nr Instances: 16
Nr Exposed: 18
Abatement Date: 12/23/2019
Gravity: 10
Report ID: 0729700
Contest Date:
Final Order: 12/19/2019
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/19/2019 | $6,630.00 | 12/23/2019 | Serious | |
| Penalty | Z: Issued | 11/26/2019 | $13,260.00 | 12/23/2019 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.219(e)(3)(i): Vertical or inclined belt(s) were not enclosed by guard(s) conforming to the requirements specified at 29 CFR 1910.219(m) and (o)(a): Employees engaged in manufacturing activities at the roller conveyor systems throughout the facility were exposed to caught-in hazards from in-running nip points in that the vertical belts located near the interior frame/leg of the conveyor system were not guarded. Roller Conveyors with unguarded vertical belts were identified in the following locations: a) Building East and West b) Building North and South c) Saw Shop Building, Alpine Auto Mill Saw 2
Translate