Violation Detail
Standard Cited: 19260451 F07 General requirements.
Inspection Nr: 1381418.015
Citation: 01002A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $3,978.00
Current Penalty: $2,386.50
Issuance Date: 03/22/2019
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 04/11/2019
Gravity: 10
Report ID: 0627510
Contest Date:
Final Order: 04/16/2019
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 04/16/2019 | $2,386.50 | 04/11/2019 | Serious | |
| Penalty | Z: Issued | 03/22/2019 | $3,978.00 | 04/11/2019 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration: a) At the construction site, where tubular welded frame scaffolding had not been erected under the direction of a competent person.
Translate