Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1345781.015
Citation: 01002A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $12,934.00
Current Penalty: $12,934.00
Issuance Date: 01/17/2019
Nr Instances: 2
Nr Exposed: 15
Abatement Date: 03/07/2019
Gravity: 10
Report ID: 0524700
Contest Date:
Final Order: 02/07/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/07/2019 | $12,934.00 | 03/07/2019 | Serious | |
Penalty | Z: Issued | 01/17/2019 | $12,934.00 | 01/29/2019 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: A) Autoplas Division, Windsor Mold Group, located at 560 Goodrich Road, Bellevue, OH 44811: On or about September 10, 2018, the employer did not ensure that periodic inspections of the energy control procedures for the hydraulic 2200 Ton Engel Press # 16 (Model: Duo 2200; Serial # 178920) and the Fanuc Robot (Type: R2000iA/165F) at the Press # 16 were conducted at least annually. Employees did not follow all the steps required for the control of the hazardous energy sources prior to conducting activities such as, but not limited to, checking part numbers, connecting air lines, checking the valve gates, troubleshooting the robotic arm, and cleaning inside the robots cage. Employees were exposed to struck-by and caughtin-between hazards while performing these tasks. B) Autoplas Division, Windsor Mold Group, located at 560 Goodrich Road, Bellevue, OH 44811: On or about September 14, 2018, the employer did not ensure that periodic inspections of the energy control procedures for the hydraulic 1000 Ton Demag Press # 13 (Model: Titan 900; Serial # 0508) and the Fanuc Robot (Type: R-2000iB/165F) at the Press # 13 were conducted at least annually. Employees did not follow all the steps required for the control of the hazardous energy sources prior to conducting activities such as, but not limited to, rearranging air lines inside the mold and working inside the robots cage. Employees were exposed to struck-by and caughtin-between hazards while performing these tasks. Employees were exposed to struck-by hazards while performing these tasks.