Violation Detail
Standard Cited: 19100179 J02 Overhead and gantry cranes.
Inspection Nr: 1308377.015
Citation: 01002A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $8,315.00
Current Penalty: $4,989.00
Issuance Date: 07/11/2018
Nr Instances: 4
Nr Exposed: 10
Abatement Date: 09/17/2018
Gravity: 5
Report ID: 0522300
Contest Date:
Final Order: 07/26/2018
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/26/2018 | $4,989.00 | 09/17/2018 | Serious | |
Penalty | Z: Issued | 07/11/2018 | $8,315.00 | 08/15/2018 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.179(j)(2): Frequent inspections of the cranes were not performed at intervals as generally defined in paragraph (j)(1)(ii)(a) of this section or as specifically indicated: On or about April 12, 2018, a frequent inspection of the cranes was not performed. The overhead cranes such as but not limited to the 5 ton Wright overhead crane in the saw department was missing bridge bumpers. The Electrolift hoist at the CNC machine had a pendant controller with the electrical wiring insulation damaged. The 10 ton Cleveland overhead crane in the production area was not marked with the load capacity and the Shaw box crane in the center of the production building that was between two cranes on the same rail system had a broken gear box that would not allow the crane to travel the rails on its own power.