Violation Detail
Standard Cited: 19100333 A01 Selection and use of work practices
Inspection Nr: 1303971.015
Citation: 01002A
Citation Type: Serious
Abatement Date: 09/10/2018 2
Initial Penalty: $12,934.00
Current Penalty: $9,053.00
Issuance Date: 08/10/2018
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): A
Gravity: 10
Report ID: 0418300
Contest Date:
Final Order: 09/07/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/07/2018 | $9,053.00 | 09/10/2018 | Serious | |
Penalty | Z: Issued | 08/10/2018 | $12,934.00 | 08/22/2018 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.333(a)(1): The employer failed to ensure that live parts were deenergized before employees began to work on or near live parts: (a) On or about 03/24/2018 - C-7 Conveyor Belt, electrical parts were not deenergized prior to work being performed on the zero-speed switch.