Violation Detail
Standard Cited: 19100022 A01 General requirements.
Inspection Nr: 1303654.015
Citation: 01002A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $3,880.00
Current Penalty: $2,970.00
Issuance Date: 07/10/2018
Nr Instances: 1
Nr Exposed: 25
Abatement Date: 07/30/2018
Gravity: 1
Report ID: 0317900
Contest Date:
Final Order: 08/01/2018
Related Event Code (REC): C
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 08/01/2018 | $2,970.00 | 07/30/2018 | Serious | |
| Penalty | Z: Issued | 07/10/2018 | $3,880.00 | 07/30/2018 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.22(a)(1): The employer did not ensure that all places of employment, passageways, service rooms, and walking-working surfaces were kept in a clean, orderly, and sanitary condition: a) Atlantic Precast Concrete - On or about March 15, 2018, debris such as broken wood, broken concrete, broken styrofoam, trash, and empty solvent/paint containers occupied floor areas such as, but not limited to, the Channel Department in the proximity of the side exit door. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.