Standard Cited: 19100027 B02 II Scaffolds and rope descent systems.
Inspection Nr: 1302457.015
Citation: 01002A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,691.00
Current Penalty: $3,400.00
Issuance Date: 07/12/2018
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 08/28/2018
Gravity: 10
Report ID: 0134000
Contest Date:
Final Order: 07/31/2018
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 07/31/2018 | $3,400.00 | 08/28/2018 | Serious | |
| Penalty | Z: Issued | 07/12/2018 | $5,691.00 | 08/28/2018 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.27(b)(2)(ii): The rope descent system is not used in accordance with instructions, warnings, and design limitations set by the manufacturer or under the direction of a qualified person; (a) Location - Newton Wellesley Hospital: On or about 3/17/18, a rope descent system was not used in accordance with the manufacturers instructions in that both work line and safety line were attached to the same building component.