Violation Detail
Standard Cited: 19100179 B03 Overhead and gantry cranes.
This violation item has been deleted.
Inspection Nr: 1295652.015
Citation: 01002A
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $11,641.00
Current Penalty: $0.00
Issuance Date: 08/07/2018
Nr Instances: 2
Nr Exposed: 5
Abatement Date:
Gravity: 10
Report ID: 0524200
Contest Date:
Final Order: 08/29/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/29/2018 | $0.00 | Serious | ||
Penalty | Z: Issued | 08/07/2018 | $11,641.00 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.179(b)(3): Modified crane(s) were not checked thoroughly for the new rated load by a qualified engineer or the equipment manufacturer: a) Hydro Laboratory- On or about February 8, 2018, the employer failed to ensure that the East Crane was load tested following the installation of the new hoist. b) Hydro Laboratory- On February 15, 2018, the employer failed to ensure that the West Crane was load tested following the installation of the new hoist. No abatement certification or documentation is required for this item.