Standard Cited: 19100147 C04 II B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1264081.015
Citation: 01002A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $12,675.00
Current Penalty: $6,337.50
Issuance Date: 10/06/2017
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 12/29/2017
Gravity: 10
Report ID: 0112600
Contest Date:
Final Order: 10/26/2017
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/26/2017 | $6,337.50 | 12/29/2017 | Serious | |
Penalty | Z: Issued | 10/06/2017 | $12,675.00 | 11/27/2017 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.147(c)(4)(ii)(B): The energy control procedures did not clearly and specifically outline the steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy. 40 Walcott St, Worcester, MA On September 15, 2017 and at times prior, the employer's energy control procedures did not specify the locations of energy sources and isolation devices to be used. Additionally, the Water Line Washer machine used steam as a thermal energy, but the procedure only identified electrical and pneumatic energy sources.