Violation Detail
Standard Cited: 19100125 B01 I
Inspection Nr: 1263279.015
Citation: 01002A
Citation Type: Serious
Abatement Date: 02/28/2018 2
Initial Penalty: $2,463.00
Current Penalty: $1,477.80
Issuance Date: 10/10/2017
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 5
Report ID: 0112000
Contest Date:
Final Order: 10/25/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/25/2017 | $1,477.80 | 02/28/2018 | Serious | |
Penalty | Z: Issued | 10/10/2017 | $2,463.00 | 11/28/2017 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.125(b)(1)(i): Properly trapped overflow piping that discharged to a safe location was not provided for any dip tank having a capacity greater than 150 gallons (568 L) or a surface area greater than 10 square feet: Heat Treat: On, or about, September 11, 2017, the Large Bump furnace was not provided with overflow piping for the oil quench tank.