Violation Detail
Standard Cited: 19100269 L03 III Electric Power Generation, Transmission, and Distribution.
This violation item has been deleted.
Inspection Nr: 1243552.015
Citation: 01002A
Citation Type: Serious
Abatement Status:
Initial Penalty: $12,675.00
Current Penalty: $0.00
Issuance Date: 12/19/2017
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 12/26/2017
Gravity: 10
Report ID: 0317000
Contest Date: 01/18/2018
Final Order: 03/26/2018
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 03/26/2018 | $0.00 | 12/26/2017 | Serious | |
| Penalty | C: Contested | 02/13/2018 | $12,675.00 | 12/26/2017 | Serious | |
| Penalty | Z: Issued | 12/19/2017 | $12,675.00 | 12/26/2017 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.269(l)(3)(iii): The employer did not ensure that no employee approached or took any conductive object closer to exposed energized parts than the employer's established minimum approach distance, unless provisions described in (l) (3) (iii) (A) - (C) were followed: a) Jobsite: PECO Pole# 2802 - The employer did not ensure an employee repairing an energized, downed 13.2 kv primary line did not approach closer than their established minimum approach distance unless the requirements of 1910.269(l)(3)(iii)(A)-(C) were met. Noted on or about 6/21/17
Translate