Violation Detail
Standard Cited: 19100184 D Slings.
Inspection Nr: 1219514.015
Citation: 01002A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $3,078.00
Current Penalty: $2,000.00
Issuance Date: 09/07/2017
Nr Instances: 1
Nr Exposed: 10
Abatement Date: 09/13/2017
Gravity: 5
Report ID: 0523400
Contest Date:
Final Order: 09/29/2017
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/29/2017 | $2,000.00 | 09/13/2017 | Serious | |
Penalty | Z: Issued | 09/07/2017 | $3,078.00 | 09/13/2017 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.184(d): Sling(s) and fastenings were not inspected by a competent person each day, before being used, for damage or defects. Damaged or defective slings were not immediately removed from service. (a) Lifting Slings: Synthetic web and wire rope slings used and stored in the cutting/saw room were not inspected for damage or defects each day as required, resulting in those damaged and/or defective slings being used to lift materials were not removed from service.