Violation Detail
Standard Cited: 19260451 B01 II General requirements.
Inspection Nr: 1174296.015
Citation: 01002A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $2,672.00
Current Penalty: $2,672.00
Issuance Date: 10/31/2016
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 11/10/2016
Gravity: 5
Report ID: 0215600
Contest Date:
Final Order: 11/28/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 10/31/2016 | $2,672.00 | 11/10/2016 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1926.451(b)(1)(ii): The platform was not planked or decked as fully as possible and the remaining open space between the platform and the uprights exceeded 9.5 inches (24.1 cm): On or about August 30, 2016- job site of 85-05 212th Street, Queens Village, NY 11427 An employee was working on a tubular welded frame scaffold that was not fully planked. WRITTEN ABATEMENT CERTIFICATION IS REQUIRED PURSUANT TO 29 CFR 1903.19