Violation Detail
Standard Cited: 19100037 A03 Maintenance, safeguards, and operational features for exit routes.
Inspection Nr: 1168701.015
Citation: 01002A
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $5,432.00
Current Penalty: $2,500.00
Issuance Date: 02/02/2017
Nr Instances: 1
Nr Exposed: 4
Abatement Date:
Gravity: 1
Report ID: 0213900
Contest Date:
Final Order: 02/28/2017
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/28/2017 | $2,500.00 | Serious | ||
Penalty | Z: Issued | 02/02/2017 | $5,432.00 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.37(a)(3): Exit routes were not free and unobstructed. Materials or equipment were placed, either permanently or temporarily, within the exit route. The exit access went through a room that could be locked, to reach an exit or exit discharge. a) 2621 Freddy Lane in Vineland, NJ, 08360- Production Area, end of Gemini line (board storage): Employees worked in areas that were cut off from exits by the storage of carts carrying boards used in the production process, observed on or about 8/10/16. NOTE: BECAUSE ABATEMENT OF THIS VIOLATION IS ALREADY DOCUMENTED IN THE CASE FILE, THE EMPLOYER NEED NOT SUBMIT CERTIFICATION OR DOCUMENTATION OF ABATEMENT OF THIS VIOLATION AS NORMALLY REQUIRED BY 29 CFR 1903.19.