Standard Cited: 19100107 B05 I Spray finishing using flammable and combustible materials.
Inspection Nr: 1137167.015
Citation: 01002A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $1,020.00
Current Penalty: $714.00
Issuance Date: 07/27/2016
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 08/31/2016
Gravity: 1
Report ID: 0830500
Contest Date:
Final Order: 08/15/2016
Related Event Code (REC): C
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 08/15/2016 | $714.00 | 08/31/2016 | Serious | |
| Penalty | Z: Issued | 07/27/2016 | $1,020.00 | 08/31/2016 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.107(b)(5)(i): There were no visible gauge(s), audible alarm(s) or pressure activated device(s) installed on paint spray booth(s) to indicate or insure that the required air velocity was maintained: (a) Ark Woodworks Inc, at 878 Baseline Place, Brighton, CO: On and preceding 4/4/16, the employer did not ensure that there was a visible gauge(s), audible alarm(s) or pressure activated device(s) installed on paint spray booth(s) to indicate or insure that the required air velocity was maintained. One employee sprayed Sherwin Williams Sher-Wood Water Conversion Varnish on millwork or other wood products in the spray paint booth and used lacquer thinner to clean the spray gun. The conversion varnish and lacquer thinner were flammable liquids. The spray paint booth was not equipped with a gauge, alarm, or pressure activated device to indicate that the required air velocity was maintained. This condition exposed the employee to a chemical hazard.