Violation Detail
Standard Cited: 19100036 B06 Design and construction requirements for exit routes.
Inspection Nr: 110466562
Citation: 01002A
Citation Type: Serious
Abatement Status: X
Initial Penalty: $625.00
Current Penalty: $437.50
Issuance Date: 06/10/1994
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 07/13/1994
Gravity: 04
Report ID: 0728500
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 07/05/1994 | $437.50 | 07/13/1994 | Serious | |
| Penalty | Z: Issued | 06/10/1994 | $625.00 | 07/13/1994 | Serious |
Translate